[![MakerBot.jpg](https://i.publiclab.org/system/images/photos/000/002/770/medium/MakerBot.jpg)](https://i.publiclab.org/system/images/photos/000/002/770/original/MakerBot.jpg) The status of [Public Lab's 10 MakerBot Replicators](http://publiclab.org/wiki/makerbot). - **Public Lab office**, Propeller Workspace, 4035 Washington Ave, New Orleans, LA - Contact: Shannon Dosemagen 1. SN______ on loan - Projects: - Maintenance: 2. SN______ on loan - Projects: - Maintenance: 3. SN _____ not operational - Projects: - Maintenance: . - ** Picayune, MS** - Contact: Dan Beavers: danbeavers at organizers dot publiclab dot org - SN______ - Projects: - Maintenance: - Arrived with both extruders upgraded to the spring loaded roller type (no delrin plungers). - Left extruder inoperable due to cable break that I just have not fixed yet. - The 5 volt power upgrade has not been performed yet. . - **Geography Department, University of Kentucky** - Contact: Jessi Breen - SN______ not operational - Projects: - Maintenance: . - **Public Lab office, Brooklyn, NY**, Former Pfizer building, 630 Flushing Avenue - Contact: Liz Barry - SN_____ not operational - Projects: - Maintenance: . - **Parts and Crafts**, Sommerville, MA - Contact Katie and Will - SN_____ - Projects: - Maintenance: - . - **Hackrfarm/University of Massachusetts** - Contact: Ian Walls - SN_______ - Projects: - Maintenance: . - ** LEAFFEST HQ**, Salisbury, VT - Contact: Chris Fastie whose gmail is cfastie - SN 11837 - Build hours: - Initial build hours 12/2013: 11 - build hours on 02/07/2014: 245 - build hours on 08/18/2014: 640 - build hours on 01/01/2015: 1000 - build hours on 02/08/2015: 1200 [![1000hours-563-4.jpg](https://i.publiclab.org/system/images/photos/000/008/556/thumb/1000hours-563-4.jpg)](https://i.publiclab.org/system/images/photos/000/008/556/original/1000hours-563-4.jpg) - Projects: - Prototyping camera rigs for aerial mapping - Experimenting with producing camera rigs for sale to Public Lab mappers - Prototyping spectrometer - Maintenance: [![UndExt-328-2.jpg](https://i.publiclab.org/system/images/photos/000/002/818/thumb/UndExt-328-2.jpg)](https://i.publiclab.org/system/images/photos/000/002/818/original/UndExt-328-2.jpg) - tightened all hex bolts holding plywood frame together 12/2014 - upgraded firmware to Makerbot v. 7.5 - broken fan replaced 12/24/2013 - new nozzles installed 01/04/2014 - 24v/5v regulator replaced 01/17/2014 - Filament feed mechanism upgraded (all prints were failing) (MakerBot replacement parts for right extruder) 02/06/2014 - Filament feed mechanism for left extruder printed and installed with MakerBot hardware 04/2014 - Printed feet, spool holders, and LCD/keypad cover - lubricated noisy fan in motherboard compartment with SuperLube 06/2014 - Replaced x-axis motor cable (all prints were failing) 08/18/2014 - x-axis idler pulley is lubricated every week with SuperLube. - Installed new ball bearing x-axis idler pulley from Alm Gear ($18). 01/20/2015 - Tightened all hex bolts holding plywood frame together. They were all loose again after 1000 hours of printing. 01/21/2015 - Tightened both grub screws on all six pulleys. They all tightened, but I noticed no difference in performance. 01/29/2015 - Removed the fan from the motherboard compartment. It is not needed for cooling (long story) and just makes noise. 02/11/2015 . - **Public Lab retail fulfillment center**, Portland, OR - Contact: Mathew Lippincott - SN 12328 - Projects: - 24v/5v regulator replaced 3/14 - spool holders replaced - indicator LEDs disconnected to prevent voltage damage to board by motors. - Maintenance: